1Site assessment
Environment, critical areas, obstacles, routes, groups and call volume.
2RF and frequency
Band, authorized channels, interference, power and radio fleet compatibility.
3Antenna system
Antenna, duplexer, cable, connectors, grounding, protection and position.
4Continuity
Power, battery/UPS where applicable, ventilation, access and contingency.
5Field test
Programming, validation by area, adjustment and recording of results.
A building or warehouse
The challenge often lies in metal structures, technical areas, basements, loading docks and internal circulation.
- Survey of dead spots
- Position and antenna system
- Testing with the actual radio fleet
Campus or outdoor area
Elevation differences, distance between buildings, vegetation and interference change the link design.
- Height and line of sight
- Protection and power
- Roaming where compatible
Multiple sites
The data network becomes part of the system and requires availability, security and clear contingency rules.
- IP interconnection
- Capacity and groups
- Degraded operation and support